The hidden costs of remodeling - South Lake Press: Community

The hidden costs of remodeling

Print
Font Size:
Default font size
Larger font size

Posted: Wednesday, June 18, 2014 6:00 am

Many homeowners who start remodeling projects, which require room additions, are stunned with sticker-shock by the hidden costs of this type of project. Most of them think, and rightly so, adding a room to a house should be really simple and not too expensive. However, that is not the case in Lake County or the state of Florida.

The process for this type of project is filled with obstacles and costs which can become too much for some homeowners to overcome.

Let’s take the following hypothetical scenario. A homeowner in south Lake County wants to build a 650-square-foot addition to their home. First, the homeowner will have to have a $200 survey completed on their property so their project can go through the county’s required zoning and approval process. In addition, the homeowner will need a complete set of engineered blueprints, which will cost about $550. The plan submitted by the homeowner to the county must also include an energy calculation on the home (cost is around $175), which in most cases will require the home’s air conditioning system and/or windows be upgraded.

For a homeowner whose home has a well or septic tank, the addition must be approved by the Health Department. To apply for additional capacity on the septic system, the homeowner must pay the Health Department $350 to inspect the area and test the soil. The Health Department will probably require the septic tank be pumped and inspected for cracks, which could cost an additional several hundred dollars. If the Health Department determines that the home’s septic tank or drain-field is not big enough, the homeowner may have to upgrade, which will cost an additional several thousand dollars.

Next in the process, the homeowner will need to submit their plan to the Lake County Building Department for approval. This process can be very frustrating for a homeowner because of the nitpicking. Once the plan is approved, then it’s time for the homeowner to open their wallet. The building permit will cost around $580 and transportation impact fees will cost $674. Why the county adds a transportation impact fee to a room addition project does not make sense, because unless it’s an RV there’s a good chance your new bathroom will never be seen driving down U.S. Highway 27.

All of the above processes occur if everything goes well. If the addition is too large, there’s a good chance everything in the home will have to be brought up to current building codes, including the landscaping. Then there is the issue with getting proper approval from the county’s zoning department. If anything is outside the norm, the homeowner can add 90 days to the process as well as more expenses. Plus, consideration must be made in regard to deed restrictions and homeowners association rules regarding the design and size of the addition.

Additions and remodels are wonderful investments in a home. For many homeowners who are upside-down financially in their home, these type of projects have become necessities. The hidden costs are the reason why many people have sticker-shock when they are quoted a price by a qualified remodeler for an addition. The best advice for any homeowner considering a remodel is simple; know your cost before starting — don’t get surprised.

More about

More about

Rules of Conduct

  • 1 Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
  • 2 Don't Threaten or Abuse. Threats of harming another person will not be tolerated. AND PLEASE TURN OFF CAPS LOCK.
  • 3 Be Truthful. Don't knowingly lie about anyone or anything.
  • 4 Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
  • 5 Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
  • 6 Share with Us. We'd love to hear eyewitness accounts, the history behind an article.

Welcome to the discussion.

Online poll

Loading…